| Wind Energy Project List | | | | Name | Year | Location | Size / Turbines | Total MW | | West
Ridge | 2003 | Pipestone County, MN | 10 x 950 kW Suzlon | 9.5 | | Christoffer | 2003 | Jackson County, MN | 6
x 950 kW Suzlon | 5.7 | | Pipestone
School | 2003 | Pipestone, MN | 1 x 900 kW NEG Micon | 0.9 | | Neppel Farms | 2004 | Armstrong, Iowa | 1
x 1500 kW NEG Micon | 1.5 | | Carleton
College | 2004 | Northfield, MN | 1 x 1650 kW Vestas | 1.65 | | Minwind III-IX | 2004 | Beaver Creek, MN | 7
x 1650 kW Vestas | 11.55 | | West
Pipestone | 2004 | Pipestone, MN | 5 x 1650 kW NEG Micon | 8.25 | | East Ridge | 2005 | Chandler, MN | 8
x 1250 kW Suzlon S64 | 10 | | Bingham
Lake | 2005 | Cottonwood Co, MN | 12 x 1250 kW Suzlon S64 | 15 | | Wolf Wind | 2005 | Rushmore, MN | 5
x 1250 kW Suzlon S64 | 6.25 | | Velva | 2005 | Velva,
North Dakota | 16 x 660 kW Vestas | 10.56 | | St. Olaf College | 2006 | Northfield, MN | 1 x 1650
kW Vestas | 1.65 | | Hardin Hilltop | 2006 | Jefferson,
Iowa | 7 x Suzlon S88 2.1 MW | 14.7 | | Crosswinds | 2006 | Ayrshire, Iowa | 10 x Suzlon
S88 2.1 MW | 21 | | Jeffers Wind
20 | 2006/2007 | Jeffers, MN | 20 x Clipper 2.5 MW | 50 | | * Summit Sub | 2006/2007 | Jeffers, MN | Alliant
69 kV Substation | | | Sleeping
Bear ** | 2006/2007 | Woodward, Oklahoma | 45 x Suzlon S88 2.1
MW | 94.5 | | * Ft Supply
Sub | 2006/2007 | Ft Supply, Oklahoma | WFEC 138kV and 69kV | | | Ewington | 2007 | Jackson Co, MN | 10
x Suzlon S88 2.1 MW | 21 | | Cisco | 2007 | Jackson
Co, MN | 4 x Suzlon S88 2.1 MW | 8.4 | | Corn Plus | 2007 | Winnebago, MN | 2 x Suzlon S88 2.1
MW | 4.2 | | Agriwind | 2007 | Tiskilwa,
Illinois | 4 x Suzlon S88 2.1 MW | 8.4 | | Wing River | 2007 | Hewitt, MN | 1 x Nordex 2.5 MW | 2.5 | | Odin | 2007 | Cottonwood Co, MN | 10
x Suzlon S88 2.1 MW | 21 | | Marshall | 2007 | Marshall,
MN | 9 x Suzlon S88 2.1 MW | 18.9 | | Top Of Iowa II | 2007 | Worth Co, Iowa | 18 x V82 1.65 MW, | 109.7 | 40 x Gamesa 2.0 MW | | Spanish Fork | 2007/2008 | Spanish Fork, Utah | 9
x Suzlon S88 2.1 MW | 18.9 | | Grand
Meadow I ** | 2008 | Mower Co, MN | 66 x GE 1.5 MW | 99 | | Grand Meadow II | 2008 | Mower Co, MN | 66
x GE 1.5 MW | 99 | | Winnebago | 2008 | Forest
City, Iowa | 10 x Gamesa 2.0 MW | 20 | | Elkhorn Ridge | 2008 | Knox Co., Nebraska | 27 x Vestas
V90 3.0 MW | 81 | | Buffalo Bear | 2008 | Buffalo,
Oklahoma | 9 x Suzlon S88 2.1 MW | 18.9 | | Hilltop Wind | 2008 | Pipestone County,
MN | 1 x DeWind 2.0 MW | 2 | | Uilk Wind | 2008/2009 | Pipestone County, MN | 3 x Vensys
1.5 MW | 4.5 | | M-Power
/ Luverne ** | 2008/2009 | Steele & Barnes Co, ND | 33 x
GE 1.5 MW, | 157.5 | 72 x GE 1.5 MW | | Grant
Wind | 2009/2010 | Grant Co, MN | 10 x Suzlon S88 2.1 MW | 21 | | Flatwater (in design) | 2009/2010 | Richardson Co, NE | 40 x GE 1.5 MW | 60 | | Highland Wind (in design) | 2009/2010 | Highland Co, VA | 19
x Gamesa 2.0 MW | 38 | | | | Total
MW Involved | 1076.6 | | * CEG also designed and built the referenced utility interconnection substations | | | ** Includes transmission line design | | | |
|